Gateway Super Clinic
The Gateway Super Clinic project involved the construction of a two storey general practitioners clinic located in Wodonga’s CBD. The precast panel superstructure with structural steel portal frame accommodates 2800m2 over the two levels and is equipped with 15 consulting rooms, pharmacy, pathology, radiology and yoga facility.
The Gateway Super Clinic incorporates many architecturally innovative components including a glass ceiling to the pharmacy area and a glazed canopy above the High Street entry.
With the front façade jutting out onto High Street, Wodonga’s main street, the use of hoarding and diversion of foot traffic was required for the duration of the project.