Wodonga Creek Flood Levee

Value

$2.2M

Location

Wodonga, VIC

Joss Construction delivered a $2 million Design and Construct flood levee for North East Water, protecting the Wodonga raw water offtake facility — the City of Wodonga's sole source of drinking water — against a 1:500 year flood event.

Works included the design and construction of a concrete flood levee wall surrounding the entire facility, a new stormwater and hydraulic system with dedicated emergency pumping capacity, a flood barrier gate, galvanised access platforms, security fencing, erosion protection and reconfiguration of existing pipework. The project was delivered defect-free in a live operational environment, navigating brownfield site challenges including hydrocarbon contamination and asbestos.

A collaborative project management approach was central to delivery, with fortnightly on-site meetings and design reviews at 30%, 80% and 100% IFC stages ensuring North East Water had meaningful input throughout. When permeability testing revealed challenging soil conditions, Joss redesigned the footing system to include clay backfilling and a waterproofing membrane, saving the client approximately $250,000. The project was completed to an exceptional standard, earning praise from North East Water for both workmanship quality and the seamless integration of new infrastructure into their existing operations.

RECENT PROJECTS